简体版 繁體版 English
Masuk Daftar

contoh kalimat abutment

"abutment" terjemahan bahasa Indonesia  
ContohHandphone
  • 5. It is mainly used for retaining walls, abutment, slope works and so on;
    5. Ini terutama digunakan untuk mempertahankan dinding, abutment, lereng bekerja dan sebagainya;
  • Largest b-foam Geofoam-Grade? installation to date, at Cikampek-Palimanan (Cipali) tol road project (overpass abutment fills)
    Instalasi b-foam Geofoam-Grade? terluas saat ini, di proyek jalan tol Cikampek-Palimanan (Cipali) (overpass abutment fills)
  • Rubber pads as a bridge pedestal, between girder and abutment reduce friction and vibration caused by bridge loads and other movements.
    Bantalan Karet sebagai tumpuan jembatan, antara girder dan abutmen mengurangi geseran dan getaran disebabkan oleh beban jembatan dan gerakan lainnya.
  • 1. Reinforcement in backfilling of retaining walls or panels used to anchor retaining walls. Construct a wrapped retaining wall or abutment.
    1. Penguatan dalam penimbunan kembali dinding penahan atau panel yang digunakan untuk menahan dinding penahan. Bangun dinding penahan yang terbungkus atau penyangga.
  • 2) Abutment Pile styled abutment, in which the foundation of pile is designed based on friction pile, can be made by hole drilling perfusion and hole digging.
    2) tiruan tumpukan ditata tiruan, di mana dasar tumpukan dirancang berdasarkan tumpukan gesekan, dapat dilakukan oleh lubang pengeboran perfusi dan menggali lubang.
  • 2) Abutment Pile styled abutment, in which the foundation of pile is designed based on friction pile, can be made by hole drilling perfusion and hole digging.
    2) tiruan tumpukan ditata tiruan, di mana dasar tumpukan dirancang berdasarkan tumpukan gesekan, dapat dilakukan oleh lubang pengeboran perfusi dan menggali lubang.
  • For waterproofing places Communications input is necessary to isolate the pipe with concrete abutment. For this purpose, use Penetron materials Penekrit and waterproofing cord Penebar.
    Untuk waterproofing tempat Komunikasi masukan yang diperlukan untuk mengisolasi pipa dengan abutment beton. Untuk tujuan ini, menggunakan Penetron bahan Penekrit dan kabel waterproofing Penebar.
  • Several months through a process called “osseointegration”. A structure called the abutment is secured onto the implant and the dental prosthesis such as a crown is then placed over it.
    beberapa bulan melalui proses yang disebut “osseointegration” (osteointegrasi). Sebuah struktur yang disebut penyangga (abutment) akan direkatkan pada implan dan kemudian gigi palsu seperti mahkota gigi dipasang di atasnya.
  • 1) The foundation of abutment applies reinforced concrete structure, and also applies C30 concrete. When abutment and abutment pile caps construction are pouring concrete, effective measures should be taken to lower hydration heat.
    1) dasar tiruan berlaku struktur beton, dan juga berlaku C30 beton. Ketika tiruan dan konstruksi caps tiruan tumpukan yang menuangkan beton, langkah-langkah efektif harus diambil panas hidrasi yang lebih rendah.
  • 1) The foundation of abutment applies reinforced concrete structure, and also applies C30 concrete. When abutment and abutment pile caps construction are pouring concrete, effective measures should be taken to lower hydration heat.
    1) dasar tiruan berlaku struktur beton, dan juga berlaku C30 beton. Ketika tiruan dan konstruksi caps tiruan tumpukan yang menuangkan beton, langkah-langkah efektif harus diambil panas hidrasi yang lebih rendah.
  • 1) The foundation of abutment applies reinforced concrete structure, and also applies C30 concrete. When abutment and abutment pile caps construction are pouring concrete, effective measures should be taken to lower hydration heat.
    1) dasar tiruan berlaku struktur beton, dan juga berlaku C30 beton. Ketika tiruan dan konstruksi caps tiruan tumpukan yang menuangkan beton, langkah-langkah efektif harus diambil panas hidrasi yang lebih rendah.
  • Application GL-4000 full hydraulic crawler Jet Grouting Anchor DTH Drilling Machine can be used for the foundation consolidation of railway, highway, abutment, and dam foundation; tunnel pipe-shed support, foundation pit support, slope protection, anchor rod hole drilling, leaking stoppage, soft...
    GL-4000 crawler penuh hydraulic DTH jangkar Jet Grouting pengeboran mesin pengeboran mesin dirancang dan diproduksi untuk jet grouting operasi, DTH pengeboran dan jangkar batang lubang pengeboran.
  • Bridge deck abutment waterproofing systems Bridge abutment waterproofing is a key point in highway engineering construction As a bridge deck waterproofing systems construction it should ensure that the bridge is prevented from leaking improve the...
    Sistem waterproofing penyangga dek jembatan Waterproofing penyangga jembatan adalah titik kunci dalam konstruksi rekayasa jalan raya. Sebagai konstruksi sistem kedap air dek jembatan, harus memastikan bahwa jembatan dicegah bocor, meningkatkan umur...
  • Bridge deck abutment waterproofing systems Bridge abutment waterproofing is a key point in highway engineering construction As a bridge deck waterproofing systems construction it should ensure that the bridge is prevented from leaking improve the...
    Sistem waterproofing penyangga dek jembatan Waterproofing penyangga jembatan adalah titik kunci dalam konstruksi rekayasa jalan raya. Sebagai konstruksi sistem kedap air dek jembatan, harus memastikan bahwa jembatan dicegah bocor, meningkatkan umur...
  • The foundation of the abutment is generally easy to sink downwards, and there is a phenomenon of jumping. The high quality PET geogrid is laid under the foundation of the abutment to improve the bearing capacity and stabilize the abutment.
    Fondasi abutment umumnya mudah untuk tenggelam ke bawah, dan ada fenomena melompat. Geogrid PET berkualitas tinggi diletakkan di bawah fondasi abutment untuk meningkatkan daya dukung dan menstabilkan abutment.
  • The foundation of the abutment is generally easy to sink downwards, and there is a phenomenon of jumping. The high quality PET geogrid is laid under the foundation of the abutment to improve the bearing capacity and stabilize the abutment.
    Fondasi abutment umumnya mudah untuk tenggelam ke bawah, dan ada fenomena melompat. Geogrid PET berkualitas tinggi diletakkan di bawah fondasi abutment untuk meningkatkan daya dukung dan menstabilkan abutment.
  • The foundation of the abutment is generally easy to sink downwards, and there is a phenomenon of jumping. The high quality PET geogrid is laid under the foundation of the abutment to improve the bearing capacity and stabilize the abutment.
    Fondasi abutment umumnya mudah untuk tenggelam ke bawah, dan ada fenomena melompat. Geogrid PET berkualitas tinggi diletakkan di bawah fondasi abutment untuk meningkatkan daya dukung dan menstabilkan abutment.
  • Description Bridge expansion joints is settled to satisfy the needs of bridge surface deformation under compression It is usually installed in middle of bridge ends bridge ends and abutment bridge joints points It plays important role in bridge and...
    Deskripsi Sambungan ekspansi jembatan diselesaikan untuk memenuhi kebutuhan deformasi permukaan jembatan pada kompresi. Hal ini biasanya dipasang di tengah ujung jembatan, ujung jembatan dan abutment, titik sendi jembatan. Memainkan peran penting...
  • After an implant is placed in the jaw bone, it will integrate with the bone over several months through a process called “osseointegration”. A structure called the abutment is secured onto the implant and the dental prosthesis such as a crown is then placed over it.
    beberapa bulan melalui proses yang disebut “osseointegration” (osteointegrasi). Sebuah struktur yang disebut penyangga (abutment) akan direkatkan pada implan dan kemudian gigi palsu seperti mahkota gigi dipasang di atasnya.
  • When sowing the grains in the holes, they must be temporarily covered with a special agrofiber. This coating will promote the rapid development of the plant and protect it from the cold. After a certain time, to eliminate the abutment of grown plants, the coating is removed.
    Ketika menabur biji-bijian di lubang, mereka harus sementara ditutup dengan agrofiber khusus. Lapisan ini akan mendorong perkembangan tanaman yang cepat dan melindunginya dari hawa dingin. Setelah waktu tertentu, untuk menghilangkan penyangga tanaman yang tumbuh, pelapis dihilangkan.
  • lebih banyak contoh:   1  2